Difference between revisions of "Response surface project from prior years"
Jump to navigation
Jump to search
Kevin Dunn (talk | contribs) (Created page with "__NOTOC__ The response surface methods (RSM) project is a mini report that is handed in, based on a competitive process optimization. The optimizers from prior years are curre...") |
Kevin Dunn (talk | contribs) |
||
Line 3: | Line 3: | ||
* [https://docs.google.com/document/d/1wNdJlLFXUf_GB27_r93t5HHpTcmJJ73MMYMdQ-lbB2Y RSM project for 2015] | * [https://docs.google.com/document/d/1wNdJlLFXUf_GB27_r93t5HHpTcmJJ73MMYMdQ-lbB2Y RSM project for 2015] | ||
* [[Response surface project - 2014| RSM project for 2014]] | * [[Response surface project - 2014| RSM project for 2014]] | ||
* [[ | * [[Response_surface_bonus_project_-_2013 | RSM project for 2013]] (awarded as a bonus) | ||
* [http://stats4eng.connectmv.com/wiki/Take-home_exam_-_2012 RSM project for 2012] (was question 4 from the take-home exam) | * [http://stats4eng.connectmv.com/wiki/Take-home_exam_-_2012 RSM project for 2012] (was question 4 from the take-home exam) | ||
* [http://stats4eng.connectmv.com/wiki/Take-home_exam_-_2011 RSM project for 2011] (was question 4 from the take-home exam) | * [http://stats4eng.connectmv.com/wiki/Take-home_exam_-_2011 RSM project for 2011] (was question 4 from the take-home exam) | ||
* [[Media:2010-4C3-6C3-Take-home-final-exam.pdf | RSM project for 2010]] (was question 2 from the take-home exam) | * [[Media:2010-4C3-6C3-Take-home-final-exam.pdf | RSM project for 2010]] (was question 2 from the take-home exam) |
Revision as of 20:32, 2 January 2016
The response surface methods (RSM) project is a mini report that is handed in, based on a competitive process optimization. The optimizers from prior years are currently not available (stay tuned though!), however you can see the project descriptions.
- RSM project for 2015
- RSM project for 2014
- RSM project for 2013 (awarded as a bonus)
- RSM project for 2012 (was question 4 from the take-home exam)
- RSM project for 2011 (was question 4 from the take-home exam)
- RSM project for 2010 (was question 2 from the take-home exam)