Difference between revisions of "Worksheets/Week6"

From Statistics for Engineering
Jump to navigation Jump to search
Line 47: Line 47:
     <code data-type="sample-code">
     <code data-type="sample-code">


 
base <- c(-1, +1)
design <- expand.grid(A=base, B=base, C=base)
A <- design$A
B <- design$B
C <- design$C
D <- A * B * C


     </code>
     </code>
</div></html>
</div></html>

Revision as of 21:12, 31 March 2019

Part 1

Your group is developing a new product, but have been struggling to get the product’s stability, measured in days, to the level required. You are aiming for a stability value of 50 days or more.

  • A: enzyme strength: -1 == 20%; +1 == 30%
  • B: feed concentration: -1 == 5%; +1 == 15%
  • C: mixer type: -1 = R mixer; +1 = W mixer

Part 2