Difference between revisions of "Worksheets/Week6"

From Statistics for Engineering
Jump to navigation Jump to search
Line 26: Line 26:
source('https://yint.org/paretoPlot.R')
source('https://yint.org/paretoPlot.R')
source('https://yint.org/contourPlot.R')
source('https://yint.org/contourPlot.R')
paretoPlot(model.stability)
paretoPlot(model.stability.poshalf)


# This is the other half-fraction, when C = -A*B
# This is the other half-fraction, when C = -A*B

Revision as of 07:24, 1 April 2019

Part 1

Your group is developing a new product, but have been struggling to get the product’s stability, measured in days, to the level required. You are aiming for a stability value of 50 days or more.

  • A: enzyme strength: -1 == 20%; +1 == 30%
  • B: feed concentration: -1 == 5%; +1 == 15%
  • C: mixer type: -1 = R mixer; +1 = W mixer

Part 2