Worksheets/Week6

From Statistics for Engineering
Revision as of 20:22, 31 March 2019 by Kevin Dunn (talk | contribs) (Created page with "=== Part 3 === Your group is developing a new product, but have been struggling to get the product’s stability, measured in days, to the level required. You are aiming for...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Part 3

Your group is developing a new product, but have been struggling to get the product’s stability, measured in days, to the level required. You are aiming for a stability value of 50 days or more.