Difference between revisions of "Main Page"

From Separation Processes: 4M3
Jump to navigation Jump to search
Line 24: Line 24:


* 29 Oct: Project due date is currently 12 November. If you are doing the challenge project, then your due date is 19 November, since there is a greater level of technical sophistication expected for this project.
* 29 Oct: Project due date is currently 12 November. If you are doing the challenge project, then your due date is 19 November, since there is a greater level of technical sophistication expected for this project.
* 04 Nov: the slides for the next  [[Liquid-liquid extraction - 2013 | liquid-liquid extraction]] section are posted.
* Sign up to see a membrane system in action, in the basement of JHE, separating an oil-water mixture. http://doodle.com/64mtfrhwbh36qv86
* 06 Nov: The midterms are completed. They will be returned in class on Thursday. The grades have been added to Avenue. Solutions to the midterm are going to be posted soon.
 
|}  
|}  
</div>
</div>

Revision as of 19:50, 7 November 2013

Separation Processes: CHE 4M3


Administrative Class materials
Crystal Clear action configure.png

Announcements (previous ones) or

  • 29 Oct: Project due date is currently 12 November. If you are doing the challenge project, then your due date is 19 November, since there is a greater level of technical sophistication expected for this project.
  • Sign up to see a membrane system in action, in the basement of JHE, separating an oil-water mixture. http://doodle.com/64mtfrhwbh36qv86


Assignments, projects, exams Course calendar