Difference between revisions of "Main Page"
Jump to navigation
Jump to search
Kevin Dunn (talk | contribs) |
Kevin Dunn (talk | contribs) |
||
Line 24: | Line 24: | ||
* 29 Oct: Project due date is currently 12 November. If you are doing the challenge project, then your due date is 19 November, since there is a greater level of technical sophistication expected for this project. | * 29 Oct: Project due date is currently 12 November. If you are doing the challenge project, then your due date is 19 November, since there is a greater level of technical sophistication expected for this project. | ||
* 06 Nov: Sign up to see a membrane system in action, in the basement of JHE, separating an oil-water mixture. http://doodle.com/64mtfrhwbh36qv86 | * <span style="color:#008000">06 Nov: Sign up to see a membrane system in action, in the basement of JHE, separating an oil-water mixture. http://doodle.com/64mtfrhwbh36qv86 </span> | ||
* 07 Nov: I've shifted the due dates for the projects and assignments around a bit, based on demand. I know this a busy time of term, so I'm happy to help in any way you need. | * 07 Nov: I've shifted the due dates for the projects and assignments around a bit, based on demand. I know this a busy time of term, so I'm happy to help in any way you need. | ||
* 07 Nov: the [[Assignment 4 - 2013|fourth assignment]] is posted, due on 19 November. | * 07 Nov: the [[Assignment 4 - 2013|fourth assignment]] is posted, due on 19 November. |
Revision as of 15:34, 8 November 2013
Separation Processes: CHE 4M3
Administrative | Class materials | ||
---|---|---|---|
|
Assignments, projects, exams | Course calendar | |||
---|---|---|---|---|
|
|