Difference between revisions of "Main Page"

From Separation Processes: 4M3
Jump to navigation Jump to search
Line 27: Line 27:
* 12 Nov: the [[Course_project_-_2013|projects]] are due by the end of the day on Thursday (for non-challenge projects).
* 12 Nov: the [[Course_project_-_2013|projects]] are due by the end of the day on Thursday (for non-challenge projects).
* 12 Nov: an interesting [http://learnche.mcmaster.ca/media/mcmaster/Moore--Using-principles-of-inherent-safety-in-design-of-hydrometallurgical-solvent-extraction-plants.pdf reading on safety in liquid-liquid extraction plants]: a further reason for counter-current operations to minimize solvent use.
* 12 Nov: an interesting [http://learnche.mcmaster.ca/media/mcmaster/Moore--Using-principles-of-inherent-safety-in-design-of-hydrometallurgical-solvent-extraction-plants.pdf reading on safety in liquid-liquid extraction plants]: a further reason for counter-current operations to minimize solvent use.
 
* 13 Nov: all the [[Liquid-liquid extraction - 2013 | liquid-liquid extraction]] slides, including full solutions, are posted.
<!-- * 11 Nov: new slides for the [[Liquid-liquid extraction - 2013 | liquid-liquid extraction]] section are uploaded. -->


|}  
|}  

Revision as of 18:09, 13 November 2013

Separation Processes: CHE 4M3


Administrative Class materials
Crystal Clear action configure.png

Announcements (previous ones) or

  • 07 Nov: I've shifted the due dates for the projects and assignments around a bit, based on demand. I know this a busy time of term, so I'm happy to help in any way you need.
  • 07 Nov: the fourth assignment is posted, due on 19 November.
  • 12 Nov: the projects are due by the end of the day on Thursday (for non-challenge projects).
  • 12 Nov: an interesting reading on safety in liquid-liquid extraction plants: a further reason for counter-current operations to minimize solvent use.
  • 13 Nov: all the liquid-liquid extraction slides, including full solutions, are posted.


Assignments, projects, exams Course calendar