Difference between revisions of "Main Page"
Jump to navigation
Jump to search
Kevin Dunn (talk | contribs) |
Kevin Dunn (talk | contribs) |
||
Line 24: | Line 24: | ||
* 29 Oct: Project due date is currently 12 November. If you are doing the challenge project, then your due date is 19 November, since there is a greater level of technical sophistication expected for this project. | * 29 Oct: Project due date is currently 12 November. If you are doing the challenge project, then your due date is 19 November, since there is a greater level of technical sophistication expected for this project. | ||
* 07 Nov: I've shifted the due dates for the projects and assignments around a bit, based on demand. I know this a busy time of term, so I'm happy to help in any way you need. | |||
* 07 Nov: the [[Assignment 4 - 2013|fourth assignment]] is posted, due on 19 November. | |||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| <span style="color:#008000">11 Nov: So the time that works best for everyone to see the membrane rig is 10:30 on Tuesday (tomorrow). Please meet outside the door of JHE room B124.</span> The room is in the basement level; take the stairs down one level from the JHE lobby, and it is room B124. Dr. David Latulippe and Tina will show you the rig and explain its operation. | |||
|} | |} | ||
|} | |} |
Revision as of 18:38, 11 November 2013
Separation Processes: CHE 4M3
Administrative | Class materials | |||
---|---|---|---|---|
|
Assignments, projects, exams | Course calendar | |||
---|---|---|---|---|
|
|