Main Page

From Separation Processes: 4M3
Revision as of 19:50, 7 November 2013 by Kevin Dunn (talk | contribs)
Jump to navigation Jump to search
Separation Processes: CHE 4M3


Administrative Class materials
Crystal Clear action configure.png

Announcements (previous ones) or

  • 29 Oct: Project due date is currently 12 November. If you are doing the challenge project, then your due date is 19 November, since there is a greater level of technical sophistication expected for this project.
  • Sign up to see a membrane system in action, in the basement of JHE, separating an oil-water mixture. http://doodle.com/64mtfrhwbh36qv86


Assignments, projects, exams Course calendar