Separation Processes: CHE 4M3
Administrative
|
Class materials
|
|
Announcements (previous ones) or
- 29 Oct: Project due date is currently 12 November. If you are doing the challenge project, then your due date is 19 November, since there is a greater level of technical sophistication expected for this project.
- 07 Nov: I've shifted the due dates for the projects and assignments around a bit, based on demand. I know this a busy time of term, so I'm happy to help in any way you need.
- 07 Nov: the fourth assignment is posted, due on 19 November.
11 Nov: So the time that works best for everyone to see the membrane rig is 10:30 on Tuesday (tomorrow). Please meet outside the door of JHE room B124. The room is in the basement level; take the stairs down one level from the JHE lobby, and it is room B124. Dr. David Latulippe and Tina will show you the rig and explain its operation.
|
|
|
|
Assignments, projects, exams
|
Course calendar
|
|
|