Difference between revisions of "Process operability - 2012"
Jump to navigation
Jump to search
Kevin Dunn (talk | contribs) m |
Kevin Dunn (talk | contribs) m |
||
Line 31: | Line 31: | ||
}} | }} | ||
== Resources == | |||
* [http://www.pc-education.mcmaster.ca/Instrumentation/flow.htm How flow is measured] | |||
* [http://www.pc-education.mcmaster.ca/Instrumentation/go_inst.htm More on instrumentation for process control] | |||
== Class slides == | == Class slides == |
Revision as of 19:37, 8 November 2012
Class date(s): | 02 November onwards | ||||
| |||||
| |||||
| |||||
Resources
Class slides
- The slides are in tab 8 of the notes.
02 November 2012 (09C)
06 November 2012 (10A)
08 November 2012 (10B)
09 November 2012 (10B)
- Operability: we will consider flexibility and reliability of processes