Difference between revisions of "Main Page"

From Engineering Economics and Problem Solving: 4N4
Jump to navigation Jump to search
Line 25: Line 25:


* 31 Oct: as your groups are working towards your economics submission, please [https://docs.google.com/spreadsheet/ccc?key=0AtqiArsxgE8YdFVzRWxOQlBqQ2J4Y1dfZTRXSFVwcXc&usp=sharing#gid=2 use this template for the cost estimates]. Feel free to modify, where necessary (e.g. if you use other sources), but this format should be good for most units.
* 31 Oct: as your groups are working towards your economics submission, please [https://docs.google.com/spreadsheet/ccc?key=0AtqiArsxgE8YdFVzRWxOQlBqQ2J4Y1dfZTRXSFVwcXc&usp=sharing#gid=2 use this template for the cost estimates]. Feel free to modify, where necessary (e.g. if you use other sources), but this format should be good for most units.
* 05 Nov: new slides for [[Process_operability_-_2013|Wednesday's class]] are posted.
* 06 Nov: in case you were uncertain, the major deliverable for Friday is the spreadsheet template above, with the capital and operating costs filled in. As mentioned in class, I will turn this spreadsheet around back to you, so you get the capital and operating costs from the other groups, so your economic analysis in the report covers the entire plant.
* 06 Nov: in case you were uncertain, the major deliverable for Friday is the spreadsheet template above, with the capital and operating costs filled in. As mentioned in class, I will turn this spreadsheet around back to you, so you get the capital and operating costs from the other groups, so your economic analysis in the report covers the entire plant.
<!-- * 05 Nov: new slides for [[Process_operability_-_2013|Wednesday's class]] are posted. -->
|}
|}



Revision as of 16:33, 6 November 2013

Engineering Economics and Problem Solving: CHE 4N4


Administrative Class materials
Crystal Clear action configure.png

Announcements (previous ones) or

  • 31 Oct: as your groups are working towards your economics submission, please use this template for the cost estimates. Feel free to modify, where necessary (e.g. if you use other sources), but this format should be good for most units.
  • 06 Nov: in case you were uncertain, the major deliverable for Friday is the spreadsheet template above, with the capital and operating costs filled in. As mentioned in class, I will turn this spreadsheet around back to you, so you get the capital and operating costs from the other groups, so your economic analysis in the report covers the entire plant.


Assignments, tutorials, projects, exams Course calendar
Crystal Clear app kedit.png

Assignments/Tutorials

Assignment questions will be available here. Parts of the assignments will be covered in the tutorial period.

Please follow these instructions when submitting electronically.


Tests, exams and project