Difference between revisions of "Process operability - 2013"

From Engineering Economics and Problem Solving: 4N4
Jump to navigation Jump to search
Line 91: Line 91:
* New set of slides for [[Media:4N04-2013-Operability-Reliability.pdf |process reliability are posted]].
* New set of slides for [[Media:4N04-2013-Operability-Reliability.pdf |process reliability are posted]].
* [http://learnche.mcmaster.ca/media/4N4-2013-Class-10C.mp3 Audio] and [http://learnche.mcmaster.ca/media/4N4-2013-Class-10C.mp4 video] recording of the class.
* [http://learnche.mcmaster.ca/media/4N4-2013-Class-10C.mp3 Audio] and [http://learnche.mcmaster.ca/media/4N4-2013-Class-10C.mp4 video] recording of the class.
== 12 November 2013 (11A): all about "''Transitions''" ==
* New set of slides for [[Media:4N04-2013-Operability-Transitions.pdf |transitions (startup/unsteady operation)]]  are posted
<!-- * [http://learnche.mcmaster.ca/media/4N4-2013-Class-11A.mp3 Audio] and [http://learnche.mcmaster.ca/media/4N4-2013-Class-11A.mp4 video] recording of the class. -->

Revision as of 22:26, 11 November 2013

Class date(s): 30 October 2013 onwards
Download video: Link [174 M]

Download video: Link [312 M]

Download video: Link [519 M]

Download video: Link [443 M]


Readings and resources

These notes are available for this section. This is a chapter from a book that Dr. Marlin is writing, and he has kindly allowed us to use it in 4N4. The PDF also includes all slides from 2012, if you'd like to review what is coming ahead.

Class slides

30 October 2013 (09C): overview of "Operability"

05 November 2013 (10A): the "Operating window"

06 November 2013 (10B): what is "Flexibility"

08 November 2013 (10C): all about "Reliability"

12 November 2013 (11A): all about "Transitions"