Difference between revisions of "Process operability - 2013"

From Engineering Economics and Problem Solving: 4N4
Jump to navigation Jump to search
Line 75: Line 75:


== 19 November 2013 (12A): about "''Batch sequencing and scheduling''" ==
== 19 November 2013 (12A): about "''Batch sequencing and scheduling''" ==
* Here are Chris Ewaschuk's notes on [[Media:4N4-2013-Batch-Sequencing.pdf |batch sequencing]].
* Here are Chris Ewaschuk's notes on [[Media:4N04-2013-Operability-Batch-Sequencing.pdf |batch sequencing]].
* [http://learnche.mcmaster.ca/media/4N4-2013-Class-12A.mp3 Audio] and [http://learnche.mcmaster.ca/media/4N4-2013-Class-12A.mp4 video] recording of the class.
* [http://learnche.mcmaster.ca/media/4N4-2013-Class-12A.mp3 Audio] and [http://learnche.mcmaster.ca/media/4N4-2013-Class-12A.mp4 video] recording of the class.

Revision as of 13:24, 20 November 2013

Class date(s): 30 October 2013 to 18 November
Download video: Link [174 M]

Download video: Link [312 M]

Download video: Link [519 M]

Download video: Link [443 M]

Download video: Link [482 M]

Download video: Link [475 M]



Readings and resources

These notes are available for this section. This is a chapter from a book that Dr. Marlin is writing, and he has kindly allowed us to use it in 4N4. The PDF also includes all slides from 2012, if you'd like to review what is coming ahead.

Class slides

30 October 2013 (09C): overview of "Operability"

05 November 2013 (10A): the "Operating window"

06 November 2013 (10B): what is "Flexibility"

08 November 2013 (10C): all about "Reliability"

12 November 2013 (11A): all about "Transitions"

13 November 2013 (11B): all about "Transitions" continued

19 November 2013 (12A): about "Batch sequencing and scheduling"