Process monitoring

From Latent Variable Methods in Engineering
Revision as of 18:57, 27 September 2011 by Kevin Dunn (talk | contribs)
Jump to navigation Jump to search

Class preparation

Class 4 (30 September)

  • Reading on process monitoring (skip over the sections on multiblock and batch processes for now)