Difference between revisions of "Main Page"

From Engineering Economics and Problem Solving: 4N4
Jump to navigation Jump to search
m
m
Line 72: Line 72:
:* [[Assignment 5 - 2012 | Assignment 5: Capital and operating cost estimation]] <span style="color:#008888">(with solutions)</span>
:* [[Assignment 5 - 2012 | Assignment 5: Capital and operating cost estimation]] <span style="color:#008888">(with solutions)</span>
:* [[Assignment 6 - 2012 | Assignment 6: Safety workshop]] <span style="color:#008888">(solutions covered in class on 23 Oct)</span>
:* [[Assignment 6 - 2012 | Assignment 6: Safety workshop]] <span style="color:#008888">(solutions covered in class on 23 Oct)</span>
:* [[Assignment 7 - 2012 | Assignment 7]]
:* [[Assignment 7 - 2012 | Assignment 7: Process drawings and engineering operability]]
:* [[Assignment 8 - 2012 | Assignment 8]]
:* [[Assignment 8 - 2012 | Assignment 8]]



Revision as of 20:45, 3 November 2012

Engineering Economics and Problem Solving: CHE 4N4


Administrative Class materials
Crystal Clear action configure.png

Announcements (previous ones)

  • Tutorial/assignment 7 is now posted. We will go over solution during the tutorial time (each group will present their answers), so it will be quick to write up your group's solution.


Assignments, tutorials, projects, exams Course calendar
Crystal Clear app kedit.png

Assignments/Tutorials

Assignment questions will be available here. Parts of the assignments will be covered in the tutorial period.

New: Please follow these instructions when submitting electronically.


Tests, exams and project