Assignment 6 - 2012
Revision as of 18:50, 19 October 2012 by Kevin Dunn (talk | contribs) (Created page with "{{OtherSidebar | due_dates = 22 October 2012 | dates_alt_text = Due date(s) | questions_PDF = 4N4-2012-Assignment-6.pdf | questions_text_alt = Assignment questions | solutions...")
Due date(s): | 22 October 2012 |
(PDF) | Assignment questions |
Link | [{{{questions_link}}} Download questions] |
Other instructions | Tutorial date: 22 October 2012 |
<rst> <rst-options: 'toc' = False/> <rst-options: 'reset-figures' = False/> Assignment objectives
=========
- AIM**: *To learn important safety strategies based on a case study.*
The case study is based on the explosions and fire caused while restarting a hydrocarbon isomerization unit at BP's Texas City refinery in 2005. More background is available on the `CSB website <http://www.csb.gov/investigations/detail.aspx?SID=20>`_.
There is a safety workshop directly after the tutorial, which will be graded as pass/fail. Please be sure to be at the tutorial 5 minutes before so we can start and finish the assignment within the 2-hour time period. </rst>